Toll SPD logo

Case study · Logistics, Transport & 3PL

Toll SPD cut long-haul truck waiting from 3 hours to 30 minutes with Mobicon

A Brisbane warehouse swapped a yard full of idle trailers for Mobicon straddle carriers. Toll SPD bought its first Mobicon in 1999 and has kept coming back for more.

  • 30 minLong-haul truck wait, down from 3 hours
  • $70KDirect savings every year (AUD)
  • $506KProductivity gain every year (AUD, calculated)

Meet Toll SPD

Toll SPD is a division of the Toll Group and an industry leader in multimodal (road, rail and sea) full container load transport. Its Brisbane warehouse and distribution centre runs a local rail-and-port shuttle as well as long-haul runs, and both relied on trailers and prime-movers standing in the yard until the dock was ready.

At a glance

Location
Brisbane, Queensland
Equipment
Two Tower Mobicon straddle carriers: the first bought in 1999, four more since

The challenge

Three problems stood out.

  1. Money tied up in idle trailers

    The local shuttle used approximately 25 trailers and 5 prime-movers, and there could be 20 trailers sitting idle in the warehouse yard as expensive container stands.

  2. Long-haul trucks waited about 3 hours

    On average a long-haul prime-mover waited 3 hours with its trailer and container in the yard before the container reached the dock.

  3. A leased yard that heavy machines don't suit

    The yard is leased, and its conditions are not suitable for a container forklift or reach stacker.

How Mobicon solved it

After discussing the options with Mobicon Systems, Toll SPD implemented a Two Tower Mobicon straddle carrier system.

Containers move without trailers

The Mobicon lifts the container off the truck, empty or full, and loads a new one for the return trip in the same cycle.

Straight from the yard to the dock

It carries containers to the loading dock and places them on dock stands, so the prime-mover no longer waits.

Spare trailers and the yard prime-mover sold

Toll SPD sold 20 trailers and the yard prime-mover, keeping 5 prime-movers and 5 trailers.

Results

Business case figures in AUD

  • Long-haul waiting cut from 3 hours to 30 minutes.
  • AUD$70,000 a year in direct savings, plus a one-off capital surplus of AUD$70,000.
  • AUD$506,250 a year in indirect savings from better prime-mover productivity.
  • Less freight damage and manual labour, and more storage area.

Equipment

Two Tower Mobicon straddle carriers

Toll SPD bought its first Mobicon in 1999 and has added four more since.

Explore the Mobicon range

The proof in the numbers

Before and after

Brisbane warehouse and distribution centre, before and after Mobicon.

Wait for a long-haul prime-mover to be unloaded

Before
3 hours
With Mobicon
30 minutes

Trailers used by the local shuttle operation

Before
About 25
With Mobicon
5

Starting trailer count is approximate.

The business case (AUD)

Direct annual savings

Trailer registration (20 trailers)$16,000
Trailer insurance (20 trailers)$24,000
Trailer maintenance$30,000
Direct savings per year$70,000

Indirect saving: $506,250 a year. 2.5 hours saved per container × 10 containers a day × 225 days a year × $90 an hour.

In their words

TOLL SPD originally acquired a Mobicon in 1999 as it was the only container handler available on the market that had the flexibility to handle all sized containers, including 48’ curtain-siders, and is designed with ideal wheel loadings suitable to our yards. We have since purchased another 4 Mobicons for our various depots, as this unit is still the only handler on the market capable of minimising on-site congestion as well as keeping our handling costs down.

Kerry QuirkOperations Manager, TOLL SPD

Trailers and trucks standing idle in your yard?

Tell us how many containers you move and what your yard is like, and we will show you what a Mobicon straddle carrier could save.

© All rights reserved