Case Studies

Mobicon lightweight straddle carriers cut labour and operating costs while delivering low point-loads for container-handling businesses across industries.

  • 30 minLong-haul wait, down from 3 hours
    $506KAnnual productivity gain
    • Logistics & 3PL

    Toll SPD cut long-haul waits from 3 hours to 30 minutes and has kept buying Mobicons

    Read case study: Toll SPD
  • $225KAnnual savings
    15%Labour saving
    • Importers & Exporters
    • 2T

    Sadleirs unloads 4–5 containers at once, spreading labour costs and lifting productivity

    Read case study: Sadleirs Logistics
  • 2008First delivery, still ongoing
    PatentedPurpose-built unit
    • Defence

    Mobicon keeps supplying straddle carriers to the US Navy's Littoral Combat Ship program

    Read case study: US Navy
  • 150Containers typically loaded each week
    30 cmCarried above the ground
    • Mining

    Queensland Magnesia keeps its container loading moving with Mobicon straddle carriers

    Read case study: Queensland Magnesia
  • 5Tractor drivers employed elsewhere
    0Tractors or trolleys needed
    • Manufacturing
    • 2T

    General Motors Holden swapped trolleys and tractors for a Mobicon 2T that took containers right to the factory

    Read case study: General Motors Holden
  • 30 cmContainers carried above the ground
    NoneExpensive wharf upgrading needed
    • Small Ports

    Alotau Stevedoring avoided a costly wharf upgrade by moving containers with a Mobicon

    Read case study: Alotau Stevedoring & Transport
  • 8-pointLoad design that protects the yard
    NoneSideloader pickups needed
    • Steel & Heavy Industry
    • 2T

    Wire Industries protected its yard and ended sideloader pickups with a Mobicon 2T

    Read case study: Wire Industries

Handling your own containers?

Tell us your container volumes and ground conditions and we will recommend the right Mobicon straddle carrier model.

Request a quote

© All rights reserved