Construction & Civil Infrastructure Solutions

Container Handling Built for Construction and Civil Infrastructure Sites

Mobicon Systems builds compact straddle carriers and container handlers for construction and civil infrastructure projects. Place containers on compacted site ground without crane hire, move site offices and materials where you need them, and relocate the machine between yards as your project moves.

4-axle
Axle load half that of any other container handler, so the Mobicon works on ground others cannot
No crane
Place containers on site without expensive crane hire for every lift and movement
Relocatable
The 2T disassembles for transport to another yard in around two hours each way
Site offices
Handles container site offices and lunchrooms with standard container configuration
Common Construction Site Challenges

Container Handling Problems That Slow Construction and Civil Projects Down

Construction and civil infrastructure sites move containers, site offices, and materials across ground that most container handling equipment cannot cope with. Crane hire is costly, yards are rough, and projects relocate. Mobicon straddle carriers are built to work within those realities.

Temporary Ground That Heavy Equipment Cannot Use

Construction yards are often temporary gravel or compacted soil rather than finished pavement. Container forklifts and reach stackers concentrate heavy loads on two axles and cannot safely operate on that ground, leaving crews without a workable container handling option on site.

Expensive Crane Hire for Every Container Placement

Hiring a crane to place or move containers on site is costly, especially when it is needed repeatedly through a project. For sites handling containers regularly, those recurring crane charges add up quickly with no lasting asset to show for the spend.

Oversized and Open-Top Loads with No Easy Handling Method

Precast panels, reinforcing, and long materials often travel in open-top containers with loads extending above the rim. Standard top-lift container handlers cannot manage loads that protrude, so a bottom-lift option is needed to move this cargo on a construction site.

Moving Site Offices and Lunchrooms Around the Yard

Container site offices and lunchrooms need repositioning as a project progresses and site layouts change. Bringing in a crane or specialist lifting equipment each time is slow and expensive, and it disrupts work while the lift is arranged and carried out.

Relocating Equipment as the Project Moves

Construction is not fixed to one location. Equipment that cannot be moved between sites easily loses its value once a project finishes. A container handler that stays stranded at a completed site is a poor investment for a business running multiple projects.

Uneven and Broken Ground Across the Site

Civil construction sites rarely have smooth, level yards. Ground is uneven, broken, and changes as work progresses. Container handling equipment needs to cope with those conditions to be useful, rather than being limited to a single prepared area of the site.

How It Works

Place, Move, and Relocate Containers on Site Without Crane Hire

A Mobicon straddle carrier gives your site its own container handling capability. One operator lifts, transports, and places containers on compacted ground, and the machine can be relocated to your next project when the work is done.

Step 01

Container Arrives, Mobicon Lifts It Off the Trailer

The Mobicon drives over the delivery trailer and lifts the container clear without a crane. There is no waiting for a crane booking and no dependency on external lifting equipment to get the container onto the site.

Step 02

Container Placed on Compacted Site Ground

Thanks to its extremely low axle weight, the Mobicon places containers on temporary gravel and compacted soil where other container handlers cannot operate. Suitability depends on the container weight and the structure of the yard.

Step 03

Site Offices and Lunchrooms Repositioned as Needed

The Mobicon handles container site offices and lunchrooms, provided they share a standard container configuration. As the site layout changes through the project, offices and amenities can be repositioned without arranging a separate crane lift.

Step 04

Open-Top and Oversized Loads Handled by the 2T

The Mobicon 2T lifts open-top containers from the bottom, handling loads that protrude above the container rim by up to around one metre. This suits precast panels, reinforcing, and long materials that a top-lift handler cannot manage.

Step 05

Uneven and Broken Yards Managed with Care

The Mobicon is not a rough terrain container handler, but it manages uneven and broken construction yards when operated with appropriate care. It works within real site conditions rather than requiring a fully prepared, level surface.

Step 06

Machine Relocated to the Next Project

When the project finishes, the 2T is relocated to the next yard. It takes around two hours to partly disassemble and load onto a lowboy or drop deck trailer, and around two hours to reassemble at the new site. Your investment moves with your work.

Side-by-Side Comparison

Mobicon vs. Alternative Container Handling Options on Construction Sites

Construction and civil operations weigh the Mobicon against crane hire and heavy container handling equipment. Here is how each option compares across the factors that matter on a working site.

FactorMobicon Straddle CarrierCrane HireReach StackerContainer Forklift
Works on Compacted Soil or Gravel✔ Yes, low axle weight~ Needs setup pad✘ Requires prepared surface✘ Requires prepared surface
Cost Structure✔ Fixed asset, on site✘ Costly per hire~ High CAPEX + running~ Moderate CAPEX
Handles Open-Top Protruding Loads✔ 2T bottom-lift, up to ~1m✔ Yes✘ Top-lift only✘ Top-lift only
Moves Site Offices and Lunchrooms✔ Yes, container config✔ Yes~ Limited~ Limited
Available On Site Any Time✔ Always on site✘ Booking required✔ On site✔ On site
Relocatable Between Projects✔ 2T, ~2 hours each way~ Mobile but hired~ Float transport~ Float transport
Yard Surface Protection✔ Half the axle load of any competitor~ Outrigger point loads✘ High point loads✘ High axle loads
Operator Licence Required✔ No licence required✘ Licensed operator✘ Licence required✘ Licence required
Product Range

Choose the Right Model for Your Construction Site and Project Type

The right Mobicon model depends on your container volume, whether stacking is required, driving distances across the site, and whether you need to relocate the machine between projects. The 2T is the only model with a bottom-lift design for open-top and protruding loads. Contact a Mobicon Systems representative to confirm the best fit.

Mobicon 2T Straddle Carrier
Entry Level
5–80 container movements per week

The 2T is the most versatile model for construction sites and the only one with a bottom-lift design. It handles open-top containers with loads protruding up to around one metre, moves site offices and lunchrooms, and can be relocated to another yard in around two hours each way.

  • Operates inside warehouses and under low awnings
  • 4-axle design that protects your yard from surface damage
  • Handles 20ft, 40ft, flat racks, half-highs, and tank containers
  • Reliable hydraulic lifting at 2 metres per minute
  • Loads containers directly onto road vehicles with ease
  • Significantly lower cost to own and run than a reach stacker
View Mobicon 2T
Mobicon 2TE Electric Straddle Carrier
Electric Entry
5–80 container movements per week

The 2TE is the battery-electric version of the 2T. Zero exhaust emissions and reduced noise make it suited to enclosed or noise-sensitive work areas, urban civil sites, and projects with emissions requirements, while keeping the same bottom-lift capability as the 2T.

  • Operates inside warehouses and under low awnings
  • 4-axle design that protects your yard from surface damage
  • Handles 20ft, 40ft, flat racks, half-highs, and tank containers
  • Battery-electric drivetrain with zero exhaust emissions
  • Quieter than diesel and suited for noise-sensitive sites
  • Significantly lower cost to own and run than a reach stacker
View Mobicon 2TE
Mobicon 2HLe Electric Straddle Carrier
Electric Option
10–200 container movements per week

The 2HLe is the battery-electric version of the 2HL. Zero exhaust emissions and quieter operation suit urban civil works, tunnel and enclosed sites, and projects with emissions or noise limits. It is harder to disassemble and relocate than the 2T, so it best suits longer-duration sites.

  • Stacks containers two high with zero exhaust emissions
  • 4-axle design that protects your yard from surface damage
  • Lithium-ion powered with both AC and DC charging options
  • Quieter than diesel and suited for noise-sensitive sites
  • Lifts at 4 metres per minute with a 2-minute load cycle
  • Lower day-to-day operating costs than diesel-powered handlers
View Mobicon 2HLe
Mobicon 3H Straddle Carrier
High Density
High-volume, 200+ movements per week

The 3H suits large infrastructure projects and site compounds where container throughput is high and laydown space is limited. Three-high stacking and a 2-minute load cycle let the site store and rotate large volumes of containers without expanding the yard footprint.

  • Stacks containers three high with a 35-tonne SWL capacity
  • 4-axle design that protects your yard from surface damage
  • 8-wheel hydraulic steering for precision in tight yards
  • Lift speed up to 7.0m per minute — fastest in the Mobicon range
  • Completes a full container load cycle in just 2 minutes
  • Far lower running costs than a reach stacker or container forklift
View Mobicon 3H
Mobicon 3HE Electric Straddle Carrier
Electric High Density
High-volume, 200+ movements per week

The 3HE delivers three-high stacking at full throughput with a battery-electric drivetrain. Zero exhaust emissions and quieter operation suit large urban infrastructure projects and site compounds with emissions compliance obligations or strict noise limits.

  • Stacks containers three high with a 35-tonne SWL capacity
  • 4-axle design that protects your yard from surface damage
  • Battery-electric drivetrain with zero exhaust emissions
  • 8-wheel hydraulic steering for precision in tight yards
  • Completes a full container load cycle in just 2 minutes
  • Lower day-to-day operating costs than diesel-powered handlers
View Mobicon 3HE
Why Construction Sites Choose Mobicon

Operational Advantages Built Around Site Flexibility and Cost Control

1

Works on Ground Where Other Handlers Cannot

Extreme low axle weights with weight-distributing bogies at each corner let the Mobicon operate on temporary gravel and compacted soil. The axle load is half that of any other container handler in the world, so the machine works on site ground that would stop a forklift or reach stacker, subject to container weight and yard structure.

2

Cut Recurring Crane Hire from Your Container Movements

Crane hire is expensive, particularly when containers are placed and moved repeatedly through a project. A Mobicon gives the site its own container handling capability, so whether it works out cheaper than a crane depends on how many containers you handle. For sites with regular movements, the saving is significant.

3

Relocate the Machine to Your Next Project

The 2T can be partly disassembled and loaded onto a lowboy or drop deck trailer in around two hours, then reassembled at the next yard in around two hours. Your container handler moves with your work rather than being stranded at a finished site, protecting the value of the investment across multiple projects.

4

Safe Lifting Without Wire Ropes

Mobicons lift with hydraulic cylinders and use no wire ropes. That eliminates swinging loads and the rope hazards common in wire rope handlers, keeping the straddle carrier stable and controlled through tight and uneven areas of the site. There are no wire ropes to replace at regular intervals, removing a recurring maintenance cost.

Construction Site Operational Advantages
Axle Load vs Any CompetitorHalf
Crane Hire DependencyReduced
2T Relocation Time~2 hrs each way
Wire Rope ReplacementsNone
Operator LicenceNot Required
Site Loads and Container Types

From Precast Panels to Site Offices, Handled by One Machine

Construction sites move more than standard closed containers. Open-top units carry oversized materials, and site offices and lunchrooms need repositioning as the project progresses. The Mobicon handles this range on site, reducing your dependence on hired lifting equipment for each task.

Choosing between the 2T and 2HL. The 2T lifts from the bottom and handles open-top containers with loads protruding up to around one metre. The 2HL is a top-lifting unit and cannot handle loads that stick out above the container. If you move open-top or oversized loads, the 2T is the model to discuss with Mobicon Systems.

Open-Top Containers and Oversized Loads

Mobicon 2T Only

The 2T bottom-lift design handles open-top containers carrying precast panels, reinforcing, and long materials that protrude above the container rim by up to around one metre. The top-lifting 2HL cannot manage protruding loads, so the 2T is the right choice for this cargo on a civil site.

Container Site Offices and Lunchrooms

Standard Container Config

The Mobicon moves shipping-container site offices and lunchrooms around the yard, provided they have a standard container configuration. As the site layout changes through the project, amenities can be repositioned without booking a crane or specialist lifting equipment each time.

Relocation Between Construction Yards

2T, ~2 Hours Each Way

The 2T is partly disassembled and loaded onto a lowboy or drop deck trailer in around two hours, then reassembled at the next site in around two hours. The 2HLe is considerably harder to disassemble and transport, so it suits sites where the machine stays in place for longer.

Four-Axle Engineering

Half the Axle Load of Any Other Container Handler on Site

Construction yards are rarely finished pavement. Temporary gravel, compacted soil, and uneven ground are the norm. Conventional container forklifts and reach stackers concentrate their full weight on two axles, which damages that ground and can leave equipment stuck. The Mobicon's axle load is half that of any other container handler in the world.

Extreme low axle weights with weight-distributing bogies at each corner spread the load across four points rather than two. Whether a Mobicon can operate on a given surface depends on the weight of the container being handled and the structure of the yard itself.

The hydraulic lifting system eliminates swinging loads and rope hazards entirely, keeping the straddle carrier stable and controlled on slopes and through tight or uneven areas of a construction site.

The Mobicon is not a rough terrain container handler. It manages uneven and broken yards as long as care is taken during operation, rather than being limited to a single prepared, level area of the site.

Half
Mobicon axle load vs any competitor
2x
Competitor axle load by comparison
Ground SuitabilityTemporary Site Surfaces
Terrain TypeUneven, With Care
After-Sales Support

Support Structured for Projects That Move

Construction projects start, finish, and relocate. Mobicon Systems structures its support around that reality, so your container handling capability stays reliable from one site to the next.

Manufacturer's Warranty Included

Every Mobicon is backed by a manufacturer's warranty. Your construction business has asset confidence from the day the unit is commissioned on site.

Serviced by Any Forklift Mechanic

Routine servicing uses standard components available through local suppliers. No specialist technician or proprietary parts are required, which matters when your equipment is working away from a home depot.

On-Site Operator Training

Mobicon Systems commissions every unit on site and provides operator training on your own equipment and yard. No official licence is required to operate a Mobicon.

Direct Telephone Support

When an issue arises on site, direct telephone support is available from Mobicon Systems to diagnose and resolve problems quickly, wherever your project is located.

Relocation Support Between Projects

Mobicon Systems can advise on the disassembly and transport process when moving a 2T between yards, helping you plan the relocation window around your project schedule.

Purchase and Rental Options

Mobicon Systems offers outright purchase and rental arrangements with a minimum term of two years. Short-term rental is not available, so rental suits businesses with an ongoing need across multiple projects rather than a single short-duration job.

Ready to Cut Crane Hire and Handle Containers On Your Own Terms?

Talk to a Mobicon Systems specialist about your site conditions, container volumes, and whether the 2T or 2HL is the right fit for your project. No obligation, just practical advice for your operation.

Frequently Asked Questions

Common Questions from Construction and Civil Infrastructure Operators

Can the Mobicon operate on temporary gravel or compacted soil at a construction site?

Due to its extremely low axle weight, a Mobicon can work on surfaces where other container handlers cannot. Suitability depends on the weight of the container being handled and the structure of the yard, so it is worth discussing your specific site conditions with Mobicon Systems.

How does the Mobicon handle open-top containers for precast panels or oversized loads?

The Mobicon 2T can handle open-top containers where the load protrudes above the rim by up to around one metre. The 2HL is a top-lifting unit and cannot handle containers with loads sticking out of the top, so the 2T is the model for this type of cargo.

What are the major advantages of using a Mobicon over other container handlers?

All Mobicons have four axles, giving an axle weight that is half that of any other container handler in the world and protecting your yard from damage. Mobicons also lift with hydraulic cylinders rather than wire ropes, which removes load swing and the cost of regular rope replacement.

Can the Mobicon be relocated from one construction site to another?

Yes. The 2T can be relocated between yards. It takes around two hours to partly disassemble and load onto a lowboy or drop deck trailer, and another two hours to reassemble at the new site. The 2HLe is considerably harder to disassemble and transport, so it suits longer-duration sites.

Is short-term rental available for a construction project?

No. Mobicon Systems does not offer rental for short periods. Rental is available with a minimum term of two years, which suits businesses with an ongoing need for container handling across multiple projects rather than a single short job.

Can the Mobicon handle shipping-container site offices and lunchrooms?

Yes, as long as the office or lunchroom has the same configuration as a standard container. The Mobicon can lift and reposition these units around the site as your layout changes through the project.

How does the Mobicon reduce crane hire costs for container placement on site?

Crane hire is expensive, and whether a crane or a Mobicon works out more cost-effective depends on how many containers you are handling. For sites with regular container movements, a Mobicon replaces recurring crane charges with a fixed on-site asset.

How does the Mobicon handle slopes and uneven ground common at civil construction sites?

The Mobicon is not a rough terrain container handler, but it can handle uneven and broken yards as long as care is taken during operation. It is built to work within the realistic ground conditions of an active construction site rather than requiring a fully prepared, level surface.

© All rights reserved