Mining Industry Solutions

Container Handling Built for Mine Sites, Remote Yards, and Tough Ground

Mobicon Systems builds compact straddle carriers and container handlers for Australian mining operations. Move ISO containers, flat racks, and dangerous goods containers on compacted gravel, dirt, and uneven ground without heavy lifting equipment that your site surface cannot support.

12T
Minimum axle load for the 2T model with a 28-tonne container, vs over 80 tonnes for forklifts
35T
Safe working load capacity across the Mobicon range including flat racks and bolsters
6 hrs
Operator training spread over two days. No prior experience or licence required.
All ISO
Every ISO container type handled including flat racks, tank containers, and dangerous goods
Common Mining Site Challenges

Container Handling Problems That Standard Equipment Cannot Solve on a Mine Site

Mine site ground conditions, remote locations, and axle load restrictions rule out most conventional container handling equipment. Mobicon straddle carriers are built around the constraints that matter most on a working mine site.

Ground That Cannot Support Heavy Container Equipment

Forklifts and reach stackers used for container handling can produce axle loads exceeding 80 tonnes. Gravel, compacted dirt, and uneven mine site ground cannot withstand that. Most mine sites need an alternative, and very few container handlers qualify.

No Suitable Equipment for Flat Racks and Oversized Loads

Mining operations regularly move heavy equipment components on flat racks and bolsters. Standard top-lift container handlers cannot manage loads that extend beyond the container profile. A bottom-lift design is required, and it is only available in specific Mobicon models.

Remote Locations with Limited Service and Parts Access

Specialist container handling equipment often depends on service agents who are not based in remote mining regions. When equipment goes down far from a metropolitan centre, waiting for a technician to travel in can mean days of operational disruption.

Extreme Dust, Heat, and Harsh Environment Degradation

Mining environments expose equipment to sustained heat, fine dust, and vibration. Equipment not designed for these conditions degrades faster, increases maintenance frequency, and reduces productive uptime at precisely the sites where downtime is most costly.

Operator Licensing Requirements on Remote Sites

Reach stackers and container forklifts require licensed operators. On remote mine sites, finding and retaining licensed equipment operators adds a layer of workforce planning complexity that is difficult to manage reliably in regional locations.

High Per-Movement Transport Costs to Remote Sites

Side-loader delivery to a remote mine site carries a significant cost premium over a standard skel trailer. For operations moving containers regularly, those per-movement charges accumulate without creating any on-site asset or handling capability.

How It Works

On-Site Container Handling Without Specialist Licensing or Heavy Ground Infrastructure

The Mobicon operates on reasonably compacted mine site ground and is maintained by local technicians trained by Mobicon Systems. One operator handles the full cycle with no licence required.

Step 01

Truck Arrives, Mobicon Lifts the Container Clear

The Mobicon operator drives over the skel trailer and lifts the container or flat rack off in a single pass. No loading dock, no ramp, no double spot required. The truck is released without waiting.

Step 02

Container Placed Where the Site Needs It

The Mobicon positions the container anywhere on the site, directly beside where goods are stored or accessed. Reducing forklift travel distance over rough ground matters on a working mine site.

Step 03

Flat Racks and Heavy Components Handled by the 2T

The Mobicon 2T lifts from the bottom and can handle flat racks and bolsters carrying heavy mining equipment components up to 35 tonnes. Load width should not significantly exceed the flat rack width for safe operation.

Step 04

Dangerous Goods Containers Moved Safely On Site

All Mobicon models can move containers holding dangerous goods. The hydraulic lifting system eliminates swinging loads and rope hazards, keeping the straddle carrier stable and controlled across sloped or uneven mine site ground.

Step 05

Operators Trained On Site in Around 6 Hours

Mobicon Systems trains operators during commissioning. Training takes around 6 hours spread over two days per operator. No prior straddle carrier experience is needed and no official licence is required to operate the machine.

Step 06

Local Mine Technicians Maintain the Machine

Mobicon Systems trains your site's technicians in routine maintenance. A spare parts package is recommended for remote deployments so critical components are on hand. Backup support is provided by Mobicon's after-sales team.

Side-by-Side Comparison

Mobicon vs. Alternative Container Handling Options on Mine Sites

Axle load is the defining factor for container handling equipment on mine site ground. Here is how the Mobicon compares against the alternatives that mine operations typically evaluate.

FactorMobicon Straddle CarrierReach StackerContainer ForkliftSide-Loader Hire
Axle Load on Mine Site Ground✔ From 12 tonnes per axle✘ Can exceed 80 tonnes✘ Can exceed 80 tonnes~ Variable
Operates on Compacted Gravel or Dirt✔ Yes, if reasonably compacted✘ Requires prepared surface✘ Requires prepared surface~ Varies by vehicle
Handles Flat Racks and Bolsters✔ 2T model, bottom-lift, 35T SWL✘ Top-lift only✘ Top-lift only~ Limited
Handles Dangerous Goods Containers✔ All models✔ Yes✔ Yes~ Varies by provider
Operator Licence Required✔ No licence required✘ Licence required✘ Licence required~ External operator
Remote Site Serviceability✔ Local technician trained by Mobicon✘ Specialist technician required~ Varies by brand~ External dependency
Cost Structure✔ Fixed capital cost~ High CAPEX + running costs~ Moderate CAPEX✘ Variable per movement
Stable on Slopes and Tight Areas✔ Hydraulic lift, no swinging loads~ Limited on uneven ground~ Limited on slopes~ Varies
Product Range

Choose the Right Model for Your Mine Site Volume and Ground Conditions

Every Mobicon operates on reasonably compacted mine site ground with axle loads far below those of conventional container equipment. The right model depends on container type, weekly volume, and whether stacking is required in your yard.

Mobicon 2T Straddle Carrier
Entry Level
5–80 container movements per week

The only model with a bottom-lift design, the 2T is the right choice for mine sites handling flat racks, bolsters, and open-top containers. Minimum axle load of 12 tonnes per axle with a 28-tonne container.

  • Operates inside warehouses and under low awnings
  • 4-axle design that protects your yard from surface damage
  • Handles 20ft, 40ft, flat racks, half-highs, and tank containers
  • Reliable hydraulic lifting at 2 metres per minute
  • Loads containers directly onto road vehicles with ease
  • Significantly lower cost to own and run than a reach stacker
View Mobicon 2T
Mobicon 2TE Electric Straddle Carrier
Electric Entry
5–80 container movements per week

The battery-electric version of the 2T. Delivers the same bottom-lift capability with zero exhaust emissions, suited to enclosed mine site facilities or areas with emissions reporting or ventilation requirements.

  • Operates inside warehouses and under low awnings
  • 4-axle design that protects your yard from surface damage
  • Handles 20ft, 40ft, flat racks, half-highs, and tank containers
  • Battery-electric drivetrain with zero exhaust emissions
  • Quieter than diesel and suited for noise-sensitive sites
  • Significantly lower cost to own and run than a reach stacker
View Mobicon 2TE
Mobicon 2HLe Electric Straddle Carrier
Electric Option
10–200 container movements per week

Full 2HL capability with a battery-electric drivetrain. Zero exhaust emissions and quieter operation make it suited to environmentally sensitive mine site areas or operations with emissions compliance obligations.

  • Stacks containers two high with zero exhaust emissions
  • 4-axle design that protects your yard from surface damage
  • Lithium-ion powered with both AC and DC charging options
  • Quieter than diesel and suited for noise-sensitive sites
  • Lifts at 4 metres per minute with a 2-minute load cycle
  • Lower day-to-day operating costs than diesel-powered handlers
View Mobicon 2HLe
Mobicon 3H Straddle Carrier
High Density
High-volume, 200+ movements per week

Built for high-volume mine site container operations. Stacks three high with a 16-tonne axle load and delivers the fastest lift speed in the Mobicon range at 7.0 metres per minute with a 2-minute load cycle.

  • Stacks containers three high with a 35-tonne SWL capacity
  • 4-axle design that protects your yard from surface damage
  • 8-wheel hydraulic steering for precision in tight yards
  • Lift speed up to 7.0m per minute — fastest in the Mobicon range
  • Completes a full container load cycle in just 2 minutes
  • Far lower running costs than a reach stacker or container forklift
View Mobicon 3H
Mobicon 3HE electric straddle carrier lifting three stacked shipping containers in a port terminal yard.
Electric High Density
High-volume, 200+ movements per week

The battery-electric version of the 3H. Delivers three-high stacking at full throughput with zero exhaust emissions, suited to intensive mine site operations with environmental compliance requirements or noise-sensitive areas.

  • Stacks containers three high with a 35-tonne SWL capacity
  • 4-axle design that protects your yard from surface damage
  • Battery-electric drivetrain with zero exhaust emissions
  • 8-wheel hydraulic steering for precision in tight yards
  • Completes a full container load cycle in just 2 minutes
  • Lower day-to-day operating costs than diesel-powered handlers
View Mobicon 3HE
Why Mine Sites Choose Mobicon

Built Around the Constraints That Matter on a Working Mine Site

1

Axle Loads That Mine Site Ground Can Actually Support

The Mobicon produces axle loads from 12 tonnes per axle with a loaded container, compared to more than 80 tonnes for reach stackers and container forklifts. On mine site gravel, compacted dirt, or uneven surfaces, that difference determines whether the equipment can be used at all.

2

Flat Racks and Dangerous Goods Handled with One Machine

The Mobicon 2T handles flat racks, bolsters, and open-top containers up to 35 tonnes. All models move dangerous goods containers safely. Your site does not need separate equipment for the different container configurations that arrive from suppliers or despatch points.

3

No Licence Required and Operators Ready in Around 6 Hours

No official licence is required to operate a Mobicon. Mobicon Systems trains operators on site during commissioning, with training taking around 6 hours across two days. Mine site staff with no prior straddle carrier experience can be operational quickly without the workforce planning burden of licensed operator recruitment.

4

Your Own Technicians Maintain the Machine On Site

Mobicon Systems trains your site's technicians in routine maintenance. Combined with a recommended on-site spare parts package, your operation is not dependent on a service agent travelling from a metropolitan centre for standard maintenance. Low fuel consumption and low maintenance requirements keep running costs predictable.

Mine Site Operational Advantages
Axle Load vs Reach StackerUp to 6x Lower
Operator Training Time~6 Hours
Licence RequirementNone
Remote ServiceabilityOn-Site
Container Types HandledAll ISO
Ground Conditions and Container Types

Operates Where Heavy Container Equipment Cannot Go

Most container handlers that can lift at 35 tonnes require prepared concrete or bitumen surfaces. The Mobicon's four-axle design with weight-distributing bogies at each corner spreads the load across the ground, allowing it to operate on reasonably compacted gravel, dirt, and uneven mine site surfaces where conventional equipment would be unsafe or unsuitable.

Surface verification recommended. The minimum axle load tolerance required is 12 tonnes for the 2T, 15 tonnes for the 2HL, and 16 tonnes for the 3H, each with a 28-tonne container. Mobicon Systems can assist with assessing whether your specific site surface meets these requirements before deployment.

Compacted Gravel and Dirt Surfaces

All Models

Mobicon straddle carriers operate on mine sites with gravel, compacted dirt, and uneven surfaces as long as the ground is reasonably compacted to the minimum axle load specification. Mobicon Systems has units working on mine sites in dusty, remote environments with consistent performance in demanding conditions.

Flat Racks, Bolsters, and Oversized Loads

Mobicon 2T Only

The 2T uses a bottom-lift design and can handle flat racks and bolsters carrying heavy mining equipment components up to 35 tonnes. There may be limitations if the load extends significantly wider than the flat rack. Contact Mobicon Systems to confirm suitability for your specific load configuration before deployment.

Dangerous Goods Containers

All Models

All Mobicon models can handle containers carrying dangerous goods. The hydraulic lifting system eliminates swinging loads and rope hazards, keeping the straddle carrier stable and controlled through tight yard areas and on sloped mine site ground where load stability is critical.

Four-Axle Engineering

The Lowest Axle Loads of Any Container Handler in the World

On a mine site, axle load determines whether a machine can be used at all. Reach stackers and container forklifts can exceed 80 tonnes of axle load. Most mine site roads and yards cannot support that. The Mobicon starts at 12 tonnes per axle, and weight-distributing bogies at each corner spread that load across the ground rather than concentrating it.

The Mobicon 2T produces a minimum axle load of 12 tonnes with a 28-tonne container. The 2HL produces 15 tonnes and the 3H produces 16 tonnes under the same load. These are the lowest figures available in any container handler on the market.

Weight-distributing bogies at each corner spread the machine's weight across four points, allowing operation on mine site surfaces that would be damaged or destabilised by conventional two-axle container handling equipment.

Surface condition should always be confirmed before deployment. Mobicon Systems can assist with surface suitability assessments to ensure the right model is matched to your specific ground conditions.

12T
Mobicon 2T minimum axle load
80T+
Reach stacker / container forklift
Axle Load DifferenceUp to 6x Lower
Surface StatusMine-Site Safe
After-Sales Support

Remote-Ready Support Built for Mine Site Deployments

Equipment downtime on a remote mine site carries a direct operational cost. Mobicon Systems structures its after-sales support around the reality of remote deployment from the outset.

Manufacturer's Warranty Included

Every Mobicon is backed by a manufacturer's warranty. Your mine site operation has asset confidence from the day the unit is commissioned on site.

Local Mine Technician Training

Mobicon Systems trains your site's own technicians to carry out routine maintenance. Your team stays self-sufficient without needing a service agent to travel from a metropolitan centre for standard maintenance tasks.

On-Site Spare Parts Package

For remote mine deployments, Mobicon Systems recommends and can supply a tailored spare parts package. Critical components are on site before they are needed, reducing downtime risk in locations far from metropolitan suppliers.

On-Site Operator Training

Mobicon Systems trains operators during commissioning. Training takes around 6 hours across two days per operator. No prior straddle carrier experience is needed and no official licence is required before training begins.

Direct Telephone Support

Direct telephone support is available when an issue arises on site. Mobicon's after-sales team provides back-up to your trained site technicians for problems that fall outside routine maintenance tasks.

Purchase and Rental Options

Mobicon Systems offers outright purchase and rental arrangements with a minimum term of two years. Rental suits operations trialling the equipment on a new mine site before committing to a full capital purchase.

Client Case Study
Mining

How Queensland Magnesia Handles 150 Containers Per Week on Hard-Packed, Uneven Ground

Queensland Magnesia operates a magnesite mine at Kunwarara and a magnesia production facility at Parkhurst in Rockhampton. At both sites, around 150 containers are loaded each week. Empty containers arrive by road, are removed from trucks and stored on site, then filled either on the ground with 20kg bags or with bulk product via tipper stands.

The yard surface at both locations is hard-packed, uneven, and dusty. A heavy forklift was not viable given those ground conditions. The operation also had to maximise the loading window for rail and export vessels by pre-receiving empty containers and positioning them where and when required. Meeting rail and ship deadlines was critical, and reliability was non-negotiable.

After consulting with Mobicon Systems, Queensland Magnesia implemented a Mobicon straddle carrier. The result was full flexibility over container movements and complete autonomy over how and when outside transport operators interfaced with the site. A second Mobicon was added in late 2007 to support increasing volumes and allow container operations to continue during planned maintenance periods.

Read the full case study
150
Containers loaded per week across mine and production facility sites
2x
Mobicons deployed as volumes grew — second unit added to maintain operations during planned maintenance
30cm
Container height from ground during movement — maximum operator visibility and stable load control
Outcomes at Queensland Magnesia
  • Full flexibility over container movements on hard-packed, uneven ground
  • Pre-receiving of empties to maximise rail and vessel loading windows
  • Complete autonomy over transport operator access to the site
  • Containers moved on twist locks at 30cm — safe and controlled
  • Operation continued during planned maintenance with second unit
  • Reliable performance in a harsh, dusty mine site environment

Ready to Put a Container Handler on Your Mine Site That Can Actually Work There?

Talk to a Mobicon Systems specialist about axle load requirements, surface conditions, and the right model for your operation. No obligation, just practical advice for your specific site.

Frequently Asked Questions

Common Questions from Mining Operations

Can the Mobicon operate on gravel, compacted dirt, or uneven mine site ground?

Yes, provided the ground is reasonably compacted. The Mobicon has the lowest axle loads of any container handler in the world, starting from 12 tonnes per axle for the 2T model with a 28-tonne container. Mobicon Systems recommends verifying your site surface tolerance before deployment and can assist with that assessment.

What is the minimum axle load tolerance required for each model?

The 2T requires a surface that can withstand 12 tonnes per axle with a 28-tonne load. The 2HL requires 15 tonnes and the 3H requires 16 tonnes under the same container weight. These figures are significantly lower than the 80-plus tonnes that reach stackers and container forklifts can produce.

Can the Mobicon handle flat racks carrying heavy mining equipment components?

Yes. The Mobicon 2T uses a bottom-lift design and can lift flat racks and bolsters up to 35 tonnes. There may be limitations if the load extends significantly wider than the flat rack. Contact Mobicon Systems to confirm suitability for your specific load configuration before deployment.

Can it handle containers with dangerous goods on site?

Yes. All Mobicon models can move containers holding dangerous goods. The hydraulic lifting system eliminates swinging loads and rope hazards, keeping the straddle carrier stable and controlled on sloped or uneven mine site ground.

How does the Mobicon perform in heat, dust, and harsh mine site environments?

Mobicon Systems has units operating on mine sites in highly dusty and remote environments with consistent performance. Combined with local technician training and an on-site spare parts package, the Mobicon is structured for reliable operation in demanding remote conditions.

What training do operators need and how long does it take?

No prior straddle carrier experience is required and no official licence is needed to operate a Mobicon. Training is delivered on site during commissioning and takes approximately 6 hours spread across two days per operator.

What servicing and parts support is available for remote mine deployments?

Mobicon Systems trains your site's own technicians in routine maintenance, removing the dependency on an external service agent. For remote deployments, an on-site spare parts package is recommended so critical components are available when needed without waiting on metropolitan supply.

Is rental available for mine site deployments?

Yes. Mobicon Systems offers rental arrangements with a minimum term of two years. Rental suits operations trialling the equipment on a new site or managing capital expenditure before committing to an outright purchase.

© All rights reserved