Mobicon Systems builds compact straddle carriers and container handlers for Australian mining operations. Move ISO containers, flat racks, and dangerous goods containers on compacted gravel, dirt, and uneven ground without heavy lifting equipment that your site surface cannot support.
Mine site ground conditions, remote locations, and axle load restrictions rule out most conventional container handling equipment. Mobicon straddle carriers are built around the constraints that matter most on a working mine site.
Forklifts and reach stackers used for container handling can produce axle loads exceeding 80 tonnes. Gravel, compacted dirt, and uneven mine site ground cannot withstand that. Most mine sites need an alternative, and very few container handlers qualify.
Mining operations regularly move heavy equipment components on flat racks and bolsters. Standard top-lift container handlers cannot manage loads that extend beyond the container profile. A bottom-lift design is required, and it is only available in specific Mobicon models.
Specialist container handling equipment often depends on service agents who are not based in remote mining regions. When equipment goes down far from a metropolitan centre, waiting for a technician to travel in can mean days of operational disruption.
Mining environments expose equipment to sustained heat, fine dust, and vibration. Equipment not designed for these conditions degrades faster, increases maintenance frequency, and reduces productive uptime at precisely the sites where downtime is most costly.
Reach stackers and container forklifts require licensed operators. On remote mine sites, finding and retaining licensed equipment operators adds a layer of workforce planning complexity that is difficult to manage reliably in regional locations.
Side-loader delivery to a remote mine site carries a significant cost premium over a standard skel trailer. For operations moving containers regularly, those per-movement charges accumulate without creating any on-site asset or handling capability.
The Mobicon operates on reasonably compacted mine site ground and is maintained by local technicians trained by Mobicon Systems. One operator handles the full cycle with no licence required.
The Mobicon operator drives over the skel trailer and lifts the container or flat rack off in a single pass. No loading dock, no ramp, no double spot required. The truck is released without waiting.
The Mobicon positions the container anywhere on the site, directly beside where goods are stored or accessed. Reducing forklift travel distance over rough ground matters on a working mine site.
The Mobicon 2T lifts from the bottom and can handle flat racks and bolsters carrying heavy mining equipment components up to 35 tonnes. Load width should not significantly exceed the flat rack width for safe operation.
All Mobicon models can move containers holding dangerous goods. The hydraulic lifting system eliminates swinging loads and rope hazards, keeping the straddle carrier stable and controlled across sloped or uneven mine site ground.
Mobicon Systems trains operators during commissioning. Training takes around 6 hours spread over two days per operator. No prior straddle carrier experience is needed and no official licence is required to operate the machine.
Mobicon Systems trains your site's technicians in routine maintenance. A spare parts package is recommended for remote deployments so critical components are on hand. Backup support is provided by Mobicon's after-sales team.
Axle load is the defining factor for container handling equipment on mine site ground. Here is how the Mobicon compares against the alternatives that mine operations typically evaluate.
| Factor | Mobicon Straddle Carrier | Reach Stacker | Container Forklift | Side-Loader Hire |
|---|---|---|---|---|
| Axle Load on Mine Site Ground | ✔ From 12 tonnes per axle | ✘ Can exceed 80 tonnes | ✘ Can exceed 80 tonnes | ~ Variable |
| Operates on Compacted Gravel or Dirt | ✔ Yes, if reasonably compacted | ✘ Requires prepared surface | ✘ Requires prepared surface | ~ Varies by vehicle |
| Handles Flat Racks and Bolsters | ✔ 2T model, bottom-lift, 35T SWL | ✘ Top-lift only | ✘ Top-lift only | ~ Limited |
| Handles Dangerous Goods Containers | ✔ All models | ✔ Yes | ✔ Yes | ~ Varies by provider |
| Operator Licence Required | ✔ No licence required | ✘ Licence required | ✘ Licence required | ~ External operator |
| Remote Site Serviceability | ✔ Local technician trained by Mobicon | ✘ Specialist technician required | ~ Varies by brand | ~ External dependency |
| Cost Structure | ✔ Fixed capital cost | ~ High CAPEX + running costs | ~ Moderate CAPEX | ✘ Variable per movement |
| Stable on Slopes and Tight Areas | ✔ Hydraulic lift, no swinging loads | ~ Limited on uneven ground | ~ Limited on slopes | ~ Varies |
Every Mobicon operates on reasonably compacted mine site ground with axle loads far below those of conventional container equipment. The right model depends on container type, weekly volume, and whether stacking is required in your yard.
The only model with a bottom-lift design, the 2T is the right choice for mine sites handling flat racks, bolsters, and open-top containers. Minimum axle load of 12 tonnes per axle with a 28-tonne container.
The battery-electric version of the 2T. Delivers the same bottom-lift capability with zero exhaust emissions, suited to enclosed mine site facilities or areas with emissions reporting or ventilation requirements.
The most widely used Mobicon on mine sites. Handles standard ISO containers with a 15-tonne axle load, stacks two high for yard density, and operates at 4 metres per minute with a full load cycle in 2 minutes.
Full 2HL capability with a battery-electric drivetrain. Zero exhaust emissions and quieter operation make it suited to environmentally sensitive mine site areas or operations with emissions compliance obligations.
Built for high-volume mine site container operations. Stacks three high with a 16-tonne axle load and delivers the fastest lift speed in the Mobicon range at 7.0 metres per minute with a 2-minute load cycle.
The battery-electric version of the 3H. Delivers three-high stacking at full throughput with zero exhaust emissions, suited to intensive mine site operations with environmental compliance requirements or noise-sensitive areas.
The Mobicon produces axle loads from 12 tonnes per axle with a loaded container, compared to more than 80 tonnes for reach stackers and container forklifts. On mine site gravel, compacted dirt, or uneven surfaces, that difference determines whether the equipment can be used at all.
The Mobicon 2T handles flat racks, bolsters, and open-top containers up to 35 tonnes. All models move dangerous goods containers safely. Your site does not need separate equipment for the different container configurations that arrive from suppliers or despatch points.
No official licence is required to operate a Mobicon. Mobicon Systems trains operators on site during commissioning, with training taking around 6 hours across two days. Mine site staff with no prior straddle carrier experience can be operational quickly without the workforce planning burden of licensed operator recruitment.
Mobicon Systems trains your site's technicians in routine maintenance. Combined with a recommended on-site spare parts package, your operation is not dependent on a service agent travelling from a metropolitan centre for standard maintenance. Low fuel consumption and low maintenance requirements keep running costs predictable.
Most container handlers that can lift at 35 tonnes require prepared concrete or bitumen surfaces. The Mobicon's four-axle design with weight-distributing bogies at each corner spreads the load across the ground, allowing it to operate on reasonably compacted gravel, dirt, and uneven mine site surfaces where conventional equipment would be unsafe or unsuitable.
Mobicon straddle carriers operate on mine sites with gravel, compacted dirt, and uneven surfaces as long as the ground is reasonably compacted to the minimum axle load specification. Mobicon Systems has units working on mine sites in dusty, remote environments with consistent performance in demanding conditions.
The 2T uses a bottom-lift design and can handle flat racks and bolsters carrying heavy mining equipment components up to 35 tonnes. There may be limitations if the load extends significantly wider than the flat rack. Contact Mobicon Systems to confirm suitability for your specific load configuration before deployment.
All Mobicon models can handle containers carrying dangerous goods. The hydraulic lifting system eliminates swinging loads and rope hazards, keeping the straddle carrier stable and controlled through tight yard areas and on sloped mine site ground where load stability is critical.
On a mine site, axle load determines whether a machine can be used at all. Reach stackers and container forklifts can exceed 80 tonnes of axle load. Most mine site roads and yards cannot support that. The Mobicon starts at 12 tonnes per axle, and weight-distributing bogies at each corner spread that load across the ground rather than concentrating it.
The Mobicon 2T produces a minimum axle load of 12 tonnes with a 28-tonne container. The 2HL produces 15 tonnes and the 3H produces 16 tonnes under the same load. These are the lowest figures available in any container handler on the market.
Weight-distributing bogies at each corner spread the machine's weight across four points, allowing operation on mine site surfaces that would be damaged or destabilised by conventional two-axle container handling equipment.
Surface condition should always be confirmed before deployment. Mobicon Systems can assist with surface suitability assessments to ensure the right model is matched to your specific ground conditions.
Equipment downtime on a remote mine site carries a direct operational cost. Mobicon Systems structures its after-sales support around the reality of remote deployment from the outset.
Every Mobicon is backed by a manufacturer's warranty. Your mine site operation has asset confidence from the day the unit is commissioned on site.
Mobicon Systems trains your site's own technicians to carry out routine maintenance. Your team stays self-sufficient without needing a service agent to travel from a metropolitan centre for standard maintenance tasks.
For remote mine deployments, Mobicon Systems recommends and can supply a tailored spare parts package. Critical components are on site before they are needed, reducing downtime risk in locations far from metropolitan suppliers.
Mobicon Systems trains operators during commissioning. Training takes around 6 hours across two days per operator. No prior straddle carrier experience is needed and no official licence is required before training begins.
Direct telephone support is available when an issue arises on site. Mobicon's after-sales team provides back-up to your trained site technicians for problems that fall outside routine maintenance tasks.
Mobicon Systems offers outright purchase and rental arrangements with a minimum term of two years. Rental suits operations trialling the equipment on a new mine site before committing to a full capital purchase.
Queensland Magnesia operates a magnesite mine at Kunwarara and a magnesia production facility at Parkhurst in Rockhampton. At both sites, around 150 containers are loaded each week. Empty containers arrive by road, are removed from trucks and stored on site, then filled either on the ground with 20kg bags or with bulk product via tipper stands.
The yard surface at both locations is hard-packed, uneven, and dusty. A heavy forklift was not viable given those ground conditions. The operation also had to maximise the loading window for rail and export vessels by pre-receiving empty containers and positioning them where and when required. Meeting rail and ship deadlines was critical, and reliability was non-negotiable.
After consulting with Mobicon Systems, Queensland Magnesia implemented a Mobicon straddle carrier. The result was full flexibility over container movements and complete autonomy over how and when outside transport operators interfaced with the site. A second Mobicon was added in late 2007 to support increasing volumes and allow container operations to continue during planned maintenance periods.
Read the full case studyTalk to a Mobicon Systems specialist about axle load requirements, surface conditions, and the right model for your operation. No obligation, just practical advice for your specific site.
Yes, provided the ground is reasonably compacted. The Mobicon has the lowest axle loads of any container handler in the world, starting from 12 tonnes per axle for the 2T model with a 28-tonne container. Mobicon Systems recommends verifying your site surface tolerance before deployment and can assist with that assessment.
The 2T requires a surface that can withstand 12 tonnes per axle with a 28-tonne load. The 2HL requires 15 tonnes and the 3H requires 16 tonnes under the same container weight. These figures are significantly lower than the 80-plus tonnes that reach stackers and container forklifts can produce.
Yes. The Mobicon 2T uses a bottom-lift design and can lift flat racks and bolsters up to 35 tonnes. There may be limitations if the load extends significantly wider than the flat rack. Contact Mobicon Systems to confirm suitability for your specific load configuration before deployment.
Yes. All Mobicon models can move containers holding dangerous goods. The hydraulic lifting system eliminates swinging loads and rope hazards, keeping the straddle carrier stable and controlled on sloped or uneven mine site ground.
Mobicon Systems has units operating on mine sites in highly dusty and remote environments with consistent performance. Combined with local technician training and an on-site spare parts package, the Mobicon is structured for reliable operation in demanding remote conditions.
No prior straddle carrier experience is required and no official licence is needed to operate a Mobicon. Training is delivered on site during commissioning and takes approximately 6 hours spread across two days per operator.
Mobicon Systems trains your site's own technicians in routine maintenance, removing the dependency on an external service agent. For remote deployments, an on-site spare parts package is recommended so critical components are available when needed without waiting on metropolitan supply.
Yes. Mobicon Systems offers rental arrangements with a minimum term of two years. Rental suits operations trialling the equipment on a new site or managing capital expenditure before committing to an outright purchase.
© All rights reserved